Gravel Prices in Missouri, October 2026
3 sites in Missouri publish what they charge, and these are their numbers. Every figure is for the material on its own, before delivery, unless the row says otherwise. Most quarries do not publish prices at all, so this sample leans toward landscape supply yards.
Missouri prices per ton
| Material | Listings | Sites | Median | Middle half | National median |
|---|---|---|---|---|---|
| Crushed Stone | 3 | 1 | $46 | $46 to $46 | $28 (+64%) |
Missouri prices per cubic yard
| Material | Listings | Sites | Median | Middle half | National median |
|---|---|---|---|---|---|
| River Rock | 21 | 1 | $205 | $105 to $303 | $112 (+83%) |
| Compost | 5 | 2 | $55 | $44 to $57 | $52 (+6%) |
| Fill Dirt | 4 | 2 | $33 | $25 to $65 | $11 (+200%) |
| Topsoil | 4 | 2 | $44 | $37 to $76 | $42 (+5%) |
| #57 Gravel | 3 | 1 | $75 | $65 to $123 | $75 (same) |
| Crushed Stone | 3 | 1 | $150 | $140 to $198 | $55 (+173%) |
| Crusher Run | 3 | 1 | $72 | $62 to $120 | $45 (+60%) |
| Pea Gravel | 3 | 1 | $94 | $84 to $142 | $65 (+45%) |
| Rip Rap | 3 | 1 | $84 | $74 to $132 | $64 (+31%) |
| Stone Dust | 3 | 1 | $70 | $60 to $118 | $56 (+25%) |
What the numbers say
River Rock appears on 1 site in Missouri, with 21 listed prices. The median is $205 per cubic yard, and half of the listings fall between $105 and $303. That is 83 percent above the national median of $112.
For Compost, Missouri sites list 5 prices from 2 sites. The middle of the range runs $44 to $57 per cubic yard, with a median of $55. That is 6 percent above the national median of $52.
Missouri yards that publish their prices
These are the listings behind the figures above.
- Fick Supply Service Inc. , Wildwood
- Northland Soil & Supply , Smithville
- Southwest Stone Supply , Osage Beach
How this was put together
We read the price pages that gravel and landscape supply yards publish on their own websites, normalized each line to one material and one unit, then took the median and the quartiles per material. A material shows up here once Missouri has three listings for it. The short write-ups above need five.
Two things to keep in mind when you use these numbers. A published price is a list price, so what you pay can differ once delivery, a minimum load, or a contractor rate enters the picture. And a yard an hour further out with cheaper stone is often the more expensive option once the truck is paid for.
Edition October 2026, compiled October 9, 2026. Updated monthly.